On Friday, the front porch pillars went up.

This is the view into the crawl space now, after having been backfilled and the back wall built up more.

Here is the side that faces the Leland Cypress trees.

By Thursday a lot had been done. Here is the brickwork along the back of the house.

On Tuesday the block work began. This picture shows the wall between the lower level and the crawl space area going up.

After the footers were in, another round of grading got the crawl space dirt down to about the footer level.