Saturday, March 7, 2009

Getting the Footers In



This view shows the footers for the front porch area and some of the crawlspace, with the lower level in the background.



This shot gives a better view of the lower level, and you may be able to see where the retaining wall will begin.


Once the initial grading was done, we had a fierce rain and the more snow than any other time during our 9 years in Due West. If you look carefully, you can see the mud left after Paul, who is doing the grading, dug a trench at the back to let the water drain out. Before he did that, the water was about 15" deep.

This is the before picture.

No comments: