Saturday, June 6, 2009

It seems like a whole lot was done this week! The heating and air is well underway, and should be done by Tuesday. Much of the rough plumbing is finished, and wire is in on the main and lower levels.

I took the photo on the left from the end of the driveway and the one on the right from the road.
This photo, taken from the play area, shows some ductwork above the southeast bedroom.

Here is the PEX system manifold. It is installed between the studs under the stairs.

This picture was taken looking into the children's bathroom. The tub/shower is in, you can see the PEX coming up through the floor, and a box nailed up for vanity lighting.

The framing for the kitchen skylights is done, and it looks great! Don had them flare the sides slightly so that the opening on the ceiling is square.

Here is the view from the back after the windows were in (except the double over the rear garage door, which needs to be replaced).

Here are the children on the bench in the master shower.